Get webhook notifications whenever Network & Infrastructure creates an incident, updates an incident, resolves an incident or changes a component status.
Date: 2017-12-19 01:00:52 UTC The card has been replaced sucessfully. We can see some lag spike during the power on of the card but nothing else.
Date: 2017-12-19 00:30:10 UTC We starting the maintenance.
Date: 2017-12-18 22:51:00 UTC We found a card with a DFC3 module on it and are ready to put it back in production. We plan to do it on 19th December at 01h00 (Paris time).
Date: 2017-12-08 04:19:17 UTC the card doesn't bring up. We will check with Cisco to have more information. there was no impact during the maintenance
Date: 2017-12-08 02:24:12 UTC We start the maintenance
Date: 2017-12-05 14:41:05 UTC The module has the hardware issue and we will replace it with the spare one.
Date: 2017-12-05 03:14:53 UTC The module not detected by vss-8b-6k:
Dec 5 03:10:41.842: %ONLINE-SP-6-REGN_TIMER: Module 9, Proc. 0. Failed to bring online because of registration timer event
Dec 5 03:10:41.842: %C6KPWR-SP-4-DISABLED: power to module in slot 9 set off (Module Failed SCP dnld)
Will check this issue with Cisco techs.
Date: 2017-12-05 02:41:32 UTC we started the maintenance.
Date: 2017-12-01 15:40:08 UTC The maintenance has been rescheduled:
Summary: We will replace the defective module.
Impact: No impact.
Start Time: 2017-12-05 02:00 (UTC)
End Time: 2017-12-05 02:45 (UTC)
Duration: 45min
Posted Nov 27, 2017 - 19:08 UTC
This scheduled maintenance affected: Infrastructure || RBX (RBX4).