Tonight around midnight, we are going to re-adjust eBGP configuration between TH2 & GSW routers in order to have better load distribution, no impact is expected.
Update(s):
Date: 2018-01-09 05:14:32 UTC Done both routers.
Date: 2018-01-09 05:08:55 UTC About to begin, preparing...
Date: 2018-01-08 15:51:56 UTC We will undo the rollback at 6:00 tomorrow, since its not related to the packet-loss mentioned earlier.
Date: 2018-01-06 12:27:40 UTC Nous avons coupe un liens avec des CRC.
Le port a commence les CRC en meme temps que l'intervention
qui a eu lieu le 3/01 à minuit, mais les problemes sont completements decorrele.
C'est ce qui nous a fait perdre du temps sur la resolution du probleme.
Date: 2018-01-06 12:24:08 UTC We found a physical problem with an optical module on th2-dsl3-a1, this port been shut, and another one belongs to the same port-channel took the charge, so the problem is eliminated.
We'll be replacing the defected module shortly.
Date: 2018-01-06 11:48:17 UTC we will hard clear the bgp session between routers, small IP outage will be expected for few seconds.
Date: 2018-01-06 11:14:37 UTC Nous observons des pertes de paquets sur les acces. Nous cherchons l'origine du probleme.
Date: 2018-01-05 18:11:11 UTC Nous continuons à suivre l'impact des changements.
Date: 2018-01-05 13:45:56 UTC As some issue were noted on client side, we are rolling back the change.
Date: 2018-01-03 23:29:06 UTC All ok.
Date: 2018-01-03 23:18:35 UTC Doing TH2.
Date: 2018-01-03 23:04:44 UTC Doing GSW side.
Posted Jan 03, 2018 - 18:23 UTC
This scheduled maintenance affected: Internet Access || FTTH.