rssLink RSS for all categories
 
icon_orange
icon_green
icon_red
icon_orange
icon_red
icon_green
icon_green
icon_orange
icon_green
icon_blue
icon_green
icon_green
icon_green
icon_green
icon_orange
icon_red
icon_green
icon_green
icon_red
icon_red
icon_green
icon_green
icon_red
icon_orange
icon_orange
icon_green
icon_green
icon_green
icon_green
icon_green
icon_red
 

FS#29843 — Public Cloud - BHS - Network

Attached to Project— Cloud
Maintenance
cloud
CLOSED
100%
Referring to Network task: https://travaux.ovh.net/?do=details&id=29839

There will be a very short network outage on our Public Cloud infrastructure in Beauharnois Datacenter:

Details:

In order to optimize the routing we will migrate from the routing protocol to the TORs of the BHS PCI infrastructure.

A slight cut (1 or 2 pings) when we switch routing protocol.

We will proceed in 3 waves:

- 1st wave on the 13/02 from 08:00 UTC to 12:00 UTC:

bhs-z2b3-a70
bhs-z2b4-a70
bhs-z2b5-a70
bhs-z2b6-a70
bhs-z2b7-a70
bhs-z2b8-a70
bhs-z2b9-a70
bhs-z2b10-a70
bhs-z2b11-a70
bhs-z2b12-a70

- 2nd wave 15/02 from 08:00 UTC to 12:00 UTC:

bhs-z2b13-a70
bhs-z2b14-a70
bhs-z2b15-a70
bhs-z2b16-a70
bhs-z2b17-a70
bhs-z2b18-a70
bhs-z2c1-a70
bhs-z2c2-a70
bhs-z2s1-a70
bhs-z2s2-a70
bhs-z2s3-a70
bhs-z2c3-a70
bhs-z2c4-a70
bhs-z2c5-a70
bhs-z2c6-a70
bhs-z2c7-a70
bhs-z2c8-a70
bhs-z2c9-a70
bhs-z2c10-a70
bhs-z2c11-a70

- 3rd wave on the 19/02 from 08:00 UTC to 12:00 UTC:

bhs-z2c12-a70
bhs-z2c13-a70
bhs-z2c14-a70
bhs-z2c15-a70
bhs-z2c16-a70
bhs-z2c17-a70
bhs-z2c18-a70
bhs-z2c19-a70
bhs-z2c20-a70
bhs-z2c21-a70
bhs-z2c22-a70
bhs-z2c23-a70
bhs-z2s4-a70
bhs-z2s5-a70
bhs-z2s6-a70
bhs-z2c24-a70
bhs-z2s7-a70
bhs-z2s8-a70
bhs-z2s9-a70
bhs-z2c25-a70
bhs-zvrack1a-a70
bhs-zvrack1b-a70
Date:  Wednesday, 21 February 2018, 21:37PM
Reason for closing:  Done