FS#29852 — 24A09

Attached to Project— Reseau Internet et Baies
Maintenance
Roubaix   → RBX-2
Planned
0%
Résumé : Nous avons detecté un défaut sur le Switch de baie qui necessite son remplacement
Actions : Remplacement du Switch.
Debut : 02-03-2018 a partir de 6h00 GMT+1
Baies affectées : 24A09
Impact : Coupure du reseau public le temps du remplacement.
Durée estimée : 1h

Summary: We have detected a fault on the switch which requires replacing
Actions: Replace Switch.
Start: 02-03-2018 starting at 6:00 AM GMT+1
Affected racks: 24A09
Impact: Disconnection of the public network during the replacement time.
Estimated time: 1h