Get webhook notifications whenever Network & Infrastructure creates an incident, updates an incident, resolves an incident or changes a component status.
Résumé : Nous avons detecté un défaut sur le Switch de baie qui necessite son remplacement.
Actions : Remplacement du Switch.
Debut : 4 mai 2018, à 6h00 (UTC +2)
Baies affectées : G115B19
Impact : Coupure du reseau public le temps du remplacement.
Durée estimée : 4 mai 2018, at 7h00 (UTC +2)
Summary: We have detected a fault on the switch which requires its replacement.
Actions: Replacement of the Switch.
Start: May 4, 2018, at 6:00AM (UTC +2)
Affected racks: G115B19
Impact: Disconnection of the public network during the replacement.
Estimated time: May 4, 2018, at 7:00AM (UTC +2)
Update(s):
Date: 2018-05-04 09:39:02 UTC
L'intervention pour le remplacement du switch est terminée
Intervention to replace the switch is complete
Date: 2018-05-04 07:54:08 UTC Il restes 3 serveurs qui ne sont pas joignable
There are 3 servers left that cannot be reachable
Date: 2018-05-04 07:00:05 UTC Nous rencontrons des difficultés, nous investiguons
We encounter difficulties, we investigate
Date: 2018-05-04 04:21:34 UTC Début de l'intervention
Intervention started
Posted Apr 27, 2018 - 03:21 UTC
This scheduled maintenance affected: Infrastructure || GRA (GRA1).