We will upgrade sbg-gre1a/b-a72 from 40gbps uplinks to 100gbps uplinks. No impact planned, everything is fully redundant.
Update(s):
Date: 2018-08-30 06:59:18 UTC We found a faulty interface was causing the CRC. A new one has been used and the link is now up and clean at 100Gbps.
Date: 2018-08-30 03:07:10 UTC It will take some time before being able to change fiber. We will proceed within the next few hours.
Date: 2018-08-30 02:27:04 UTC We still are on the last port that have CRC. We changing the fiber.
Date: 2018-08-30 00:26:38 UTC We run into a total isolation of B side because of an error of the port removal. All traffic has been re-routed but some latency/loss can be seen few seconds. The port is back online and we continue the procedure.
Date: 2018-08-29 23:49:50 UTC We start maintenance on sbg-gre1b-a72
Date: 2018-08-29 23:28:14 UTC The second uplinks of sbg-gre1a-a72 is back in production. It is now fully upgraded on 2x100Gbps.
We will start maintenance on sbg-gre1b-a72 in 30 minutes.
Date: 2018-08-29 22:51:36 UTC First link is finished, back in prod no CRC.
We isolate the second link of sbg-gre1a-a72.
Date: 2018-08-29 22:23:17 UTC We will start the maintenance by isolating the first link.
Posted Aug 29, 2018 - 21:43 UTC
This scheduled maintenance affected: Infrastructure || SBG (SBG1, SBG3, SBG4).