Get webhook notifications whenever Network & Infrastructure creates an incident, updates an incident, resolves an incident or changes a component status.
Résumé: Nous avons detecté un défaut sur le switch IPMI qui nécessite son remplacement.
Actions: Remplacement du switch IPMI.
Debut: 14 Février 2019 a partir de 5h00 GMT+1
Baies affectées: G132B11
Impact: Coupure du réseau IPMI le temps du remplacement.
Durée estimée : 1h
Summary: We have detected a fault on the IPMI switch which requires replacing.
Actions: Replace IPMI switch.
Start: February 14th 2019 starting at 5h00 AM GMT+1
Affected racks: G132B11
Impact: Disconnection of the IPMI network during the replacement time.
Estimated time: 1h
Update(s):
Date: 2019-02-14 04:22:52 UTC Intervention complétée
Intervention completed
Date: 2019-02-14 04:04:18 UTC Nous débutons l'intervention.
We are starting the intervention.
Posted Feb 10, 2019 - 00:28 UTC
This scheduled maintenance affected: Infrastructure || GRA (GRA1).