OVHcloud Network Status

Current status
Legend
  • Operational
  • Degraded performance
  • Partial Outage
  • Major Outage
  • Under maintenance
RBX
Scheduled Maintenance Report for Network & Infrastructure
Completed
We need to replace the controller cards for RBX optical node.

There are no impact expected, the controller cards are fully redundant.

The maintenance window is on March 7th 2019 00h00 UTC+1. Duration 2hrs.

Update(s):

Date: 2019-03-07 00:19:59 UTC
All controler card were repladed.

Date: 2019-03-06 23:51:56 UTC
First card is now replaced.

We proceed with the switch over and replacement of the second controler card.

Date: 2019-03-06 23:05:30 UTC
We will replace the first controler card.
Posted Mar 05, 2019 - 15:00 UTC