Get webhook notifications whenever Network & Infrastructure creates an incident, updates an incident, resolves an incident or changes a component status.
We are scheduling a planned work on the optical node of Strasbourg:
- March 26th from 23:00 CET (nght from 26th to 27th March)
These operations are intended to separate the Strasbourg optical node into 3 independent entities and thus reduce the load on each of the nodes.
During this second maintenance, we will migrate 4 other chassis from the existing node to another node.
Since this work concerns only the control plane part of our optical equipment, we do not expect any impact on the traffic.
Update(s):
Date: 2019-03-27 00:04:14 UTC La maintenance est terminée. Le nouveau noeud sbg-g2-txp1 est en production avec 4 chassis qui fonctionnent maintenant indépendamment du noeud principal.
--
Maintenance is completed. New node sbg-g2-txp1 is now in production with 4 shelves now running independantly from the main node.
Date: 2019-03-26 23:07:52 UTC Les opérations de préparation sont terminées. Nous allons maintenant démarrer la séparation des chassis transpondeurs vers le nouveau noeud sbg-g2-txp1
--
Preparation operations are completed. We are now gong to start the split of transponders shelves to new node sbg-g2-txp1.
Date: 2019-03-26 22:16:50 UTC Nous démarrons les opérations.