Get webhook notifications whenever Network & Infrastructure creates an incident, updates an incident, resolves an incident or changes a component status.
In order to reinforce our infrastructure in APAC, we are going to install 2 new routers.
Here is a small schedule about this migration:
# 07/04/2020 – 03:00AM to 06:00AM (Singapore Time): Add a new router in the network to add redundancy and capacity for the InterDC routing.
# 08/04/2020 – 03:00AM to 06:00AM (Singapore Time): Replace the border router to have more capacity towards external networks.
# 09/04/2020 – 03:00AM to 06:00AM (Singapore Time): Add capacity to the data-centre. From 200G to 500G of capacity for the Singaporean DC.
No impact is expected.
Update(s):
Date: 2020-04-09 02:01:07 UTC Done. New capacity has been added.
Date: 2020-04-08 22:42:45 UTC Isolation has been done. We move the line to the new equipment.
Date: 2020-04-08 22:16:47 UTC We are starting the maintenance. We isolate the link DC < > POP. No impact is expected.
Date: 2020-04-07 21:11:49 UTC Everything is connected and in production. We keep in eye on it.
Date: 2020-04-07 20:59:52 UTC All the links are now up. We put back in production.
Date: 2020-04-07 19:27:52 UTC Isolation has been done. We are going to call the datacenter in order to migrate the links.
Date: 2020-04-07 18:47:26 UTC We are starting the maintenance.
Date: 2020-04-06 23:04:58 UTC Everything is connected and in production. We keep in eye on it.
Date: 2020-04-06 21:09:58 UTC Devices have been isolated, we move the fibers to the new routers.
Date: 2020-04-06 18:56:20 UTC We are going to start the maintenance. The first step is to isolate the entire POP. The traffic will shift to the other POP.
> http://weathermap.ovh.net/#apac