OVHcloud Network Status

Current status
Legend
  • Operational
  • Degraded performance
  • Partial Outage
  • Major Outage
  • Under maintenance
L107B12
Scheduled Maintenance Report for Network & Infrastructure
Completed
Actions : Remplacement des câbles d’alimentations C13/C14 de la baie
Début d’intervention : 3 mars 2021 à partir de 6h00 UTC+1
Baie : L107B12
Impact : Coupure des serveurs durant l’intervention.
Durée d’intervention : 2 heures

Summary : We are going to intervene in the rack to replace a large number of power supply cables that could have an insulation defect.
Actions : Replacement of the C13/C14 power supply cables of the rack
Start of intervention : 3 march 2021 starting at 6h00 AM UTC+1
Rack : L107B12
Impact : Server outage during the intervention.
Duration of intervention : 2 hours

Update(s):

Date: 2021-03-03 10:05:56 UTC
Intervention terminée.

Intervention done.

Date: 2021-03-03 05:04:43 UTC
Nous demarrons l'intervention.

Intervention is started.
Posted Feb 12, 2021 - 02:28 UTC
This scheduled maintenance affected: Infrastructure || LIM (LIM1, LIM2, LIM3).