Get webhook notifications whenever Network & Infrastructure creates an incident, updates an incident, resolves an incident or changes a component status.
We are going to upgrade the rbx6-100a-a70-vrack on 26/05/2021 at 09:59 PM UTC.
start date : 26/05/2021 at 09:59 PM UTC
End date : 26/05/2021 at 10:29 PM UTC
=====
Nous allons mettre à jour le rbx6-100a-a70-vrack le 26/05/2021 à 09:59 PM UTC.
date de début : 26/05/2021 at 09:59 PM UTC
date de fin : 26/05/2021 at 10:29 PM UTC
Update(s):
Date: 2021-05-27 00:58:57 UTC we replaced the switch due to an hardware issue. The vrack traffic behind this switch was impacted during 2 hours
Date: 2021-05-27 00:31:02 UTC the new switch is now in production, everything is ok now
Date: 2021-05-26 23:30:38 UTC we are racking the new switch
Date: 2021-05-26 23:12:22 UTC we have to change the switch due to an hardware failure
Date: 2021-05-26 22:35:45 UTC the switch seems to be long to come back in production, we are checking
Date: 2021-05-26 22:28:21 UTC we are reloading the switch
Date: 2021-05-26 22:14:11 UTC we are starting the meaintenance
Posted May 07, 2021 - 08:31 UTC
This scheduled maintenance affected: Infrastructure || RBX (RBX6).