FS#53197 — N5/N56/N6 ISSU campain

Attached to Project— Network and racks
Maintenance
Entire OVH Network
Planned
0%
Description:
An upgrade campaign is launched on all Nexus 5000/5600/6000 of Baremetal aggregator switches.

Maintenance date: 23 September 2021, 7:00 - 11:00 (UTC Time) in Beauharnois, CAN datacenter
Reload: Could have 2 to 5 minutes impact
bhs6-11a/b-n56 (Impacted subnets: 66.70.182.0/24,66.70.183.0/24)